The Building Department requires the person doing the work to call and request the required inspection.

Scheduling an Inspection

24 hour notice is required for all inspection requests. All attempts will be made to perform the inspection within 24 hours. This may not always be possible due to the large area we cover.

When an inspection is called in you will be given a morning or afternoon when requesting the inspection. Times will not be given except in special circumstances.

Outlying Area

Inspections in the outlying areas of Denio, Kings River, McDermitt will be performed on Wednesdays.

Roofs

During the roof framing inspection phase of a project all aspects of the roof area are required to be ready for inspection i.e.:

  • Bracing
  • Clips
  • Roof framing
  • Roof sheathing nailing
  • Trusses
  • Vents

Rough Inspections

During the "rough" inspection phase of a project, all aspects of the job are required to be ready for inspection at the same time. These include: 

  • Electrical
  • Mechanical
  • Plumbing
  • Wall framing

Required Inspections

Building Permit

  • Underground Utility Inspection
  • Foundation Inspection
  • Stem wall / Basement Walls / Retaining Walls
  • Pre-Slab
  • Under floor inspection
  • Roof sheating inspection (Includes roof framing)
  • Shear / Brace Wall Inspection
  • Framing and rough electrical, mechanical, and plumbing
  • Insulation
  • Sheetrock
  • Final

Manufactured Home

  • Stemwall footing and runner
  • Runner
  • Underground utilities
  • Final

Electrical

  • Underground
  • Service
  • Rough
  • Final

Plumbing 

  • Underground
  • Rough
  • Gas test
  • Appliance

Mechanical

  • Underground
  • Rough
  • Gas test
  • Appliance

Recreational Vehicle

  • Underground utilities
  • Final